CRONYM | TERM | 中文译名 |
GCP | Global Capability Planning | 全球产能计划 |
EDDL | Electronic Direct Data Link | 电子数据链接 |
BIW | Body in White | 白车身 |
Chassis parts | 底盘件 | |
TS-16949 | Technical Specification – 16949 | 技术规范-16949 |
Bl | Blanking | 落料 |
Dr | Drawing | 拉延 |
Fo | Forming | 成形 |
Tr | Trimming | 切边 |
Fl | Flanging | 翻边 |
UFL | Up Flange | 上翻边 |
PI | Pierce | 冲孔 |
RST | Restriken | 整形 |
CPI | Cam-Piercing | 侧冲孔 |
CT | Cut | 切断 |
SET | Separate | 切开 |
BND | Bending | 压弯 |
BU | Burling | 翻口 |
汽车零部件详解CU | Curling | 卷耳 |
HEM | Hemming | 折边 |
TRA | Trans Far | 多工位 |
DACROMET | 达克罗 | |
Electrophoretic paint | 电泳漆 | |
RDC | Regional Distribution Center | |
ASN | Advanced shipping notice | 提前发货通知 |
MRD | Material Required Date | 物料要求到厂日 |
PPM | Parts per million | 零件的百万分新比率(适合供应商不合格零件) |
SREA | Supplier request for engineering approval | 供应商要求工程批准 |
MP&L | Material, planning and logistics | 材料、计划和物流 |
Phase0 | Phase0 (Run at Rate) | 节拍验证(模具调试样件合格) |
Phase1 | Phase1 (Quality Verification) | 质量验证阶段 |
Phase2 | Phase2 (Production Verification) | 生产验证阶段 |
Phase3 | Phase3 (Capacity Verification) | 产能验证阶段 |
PCF | Part coordination fixture | 检查所有钣金件之间的匹配质量,如:间隙/干涉,以及分总成/总成/白车身的尺寸精度 |
VTTO | Vendor Tool Try-Out | CFMA焊接生产线在工装厂预验收 |
TTO | Tool Try-Out | CFMA焊接生产线回厂安装调试 |
VP | Verification prototype | 所有外部零件第一次装车验证,包括总装件 |
HB | Homologation build | 所有外部零件继续装车验证,生产出来的整车主要用于进行法规试验;也称法定装车 |
TT | Tool trial-build start | 焊接生产线的Job#1,白车身质量需要达到目标要求 |
PP | Pilot production-build start | 实验性的批量生产,主要验证涂装、总装的设备工装是否满足量产要求; |
MP1 | Mass production 1 | 第一次正式批量生 |
IH ASSY | In House Assembly | 长安福特装配总成 |
IH | In House Component | 长安福特总成 |
EP/LP | Outsourcing Delivery Level –Assy or Component | 交付状态-总成或组件 |
LP | Local Component or Sub-Assy | 冲压片件 |
SP | Import Component Or Sub-Assy | 进口标件 |
SP/C | Import Component Or Sub-Assy, Consign to Supplier | 供应商采购进口标件 |
LP/C | Local Component Or Sub-Assy, Consign to Supplier | 供应商采购本地标件 |
ABS | Anti-skid brake system | 防抱死制动系统 |
APW | Average Per Weekly | 每周平均产能 |
MPW | Max Per Weekly | 每周最大产能 |
BOM | Bill Of Materials | 物料清单 |
CMM | Coordinate Measuring Machine | 三坐标测量设备 |
CP | Confirmation Prototype | 验证原型车 |
CPE | Chief Program Engineer | 首席项目工程师 5h Dy62PRr |
CPV | Capacity Planning Volume | 产能规划 |
DL | Die Layout | 模具工艺过程图 |
ECC | Engineering Change | 工程变更 |
EDI | Electronic Data Interchange | 电子数据交换 |
ED&T | Engineering Development & Testing | 工程开发及试验 |
ETA | Early Tooling Authorization | 前期工装批准(授权) |
FIFO | First in First Out | 先进先出 |
FQRs | Frequent Quality Rejects | 经常性质量不合格品 +Il QZwm~ |
FSP | Ford Supplier Portal | 福特供应商入口网站 |
MPW | Max Per Weekly | 每周最大产能 |
MUD | Material Utility Data | 材料利用率 |
OTS | Off Tooling Sample | 正式工装/模具生产样品/全工装样件;半工装/工装样件 |
PSW | Part Submission Warrant | 零件质量合格验收 |
PPAP | Production Parts Approval Process | 生产件批准程序 |
CMM | Coordinate Measurement Machine | 三次元(三座标) |
Checking fixture | 检具 | |
progressive die | 激进模(连续模) | |
fixture | 夹具 | |
POP | Paid On Production | 下线支付件 |
TCF | 总装 | |
SOP | Standard Of Procedure | 标准作业流程 |
SUV | Sports Utility Vehicle | 运动型汽车 |
hydraulic press | 油压机 | |
Two-dimensional | 二次元 | |
manipulator | 机械手 | |
Remark: Editor adds the content in shadow. 备注:阴影部分的内容为编者增加。