酷熊改装SGMW VDR Program Quality and Readiness Review
SGMW VDR 项目质量就绪评审会议
Status 状态Function 部门
GVDP Del.
Number 代码SGMW Number SGMW 代码
Deliverable Name
交付物名称
Chinese Description
中文描述
Owner 责任人Customer 客户
Comments
备忘
PE 10021Vehicle Packaging scheme  Release.整车总布置方案发布PE  PE PE大连之星
10566
Product Engineering Issues status
微面改装
产品工程问题解决状态
PE
上牌费用
PE
PE 10755Develop Verified Data Release (VDR) - T2验证数据发布-T2数据PE  PE/ME
PE SGMW035 Vehicle Critical Physical Testing Status 规范试验完成情况
PE PE PE 10535
Key Product Characteristic List
完成关键产品特性(KPC )清单PE ME/MD IV 阀要求PE SGMW034OTS approve plan
OTS认可计划
PE SQ IV 阀要求
PE SGMW068Prototype Critical performance status 软工装车关键性能指标状态PE PEM/PCE PE SGMW055Complete DFMEA Audit
完成DFMEA编制与评审PE QD PE SGMW018Develop design  Error Proofing list 完成设计防错清单PE MD/ME PE SGMW019Complete Vehicle Technical Specification 完成整车技术规范
PE PE PE SGMW020
EMS Calibration plan & status
动力(EMS )标定计划与进展情况PE PE PE 10179Validate Plan For prototype Vehicle status
软工装车辆制造验证计划完成情况PE PCE PE SGMW015Completed Vehicle Math ModleDesign Audit Result (Concept)
33连导航完成整车数模设计评审(虚拟车)PE PCE PE SGMW014
Class A C/F List Released
发布A 类检具清单PE SQD/PUR ME 10307Dimensional Technical Specification (DTS).尺寸技术规范
ME PCE ME 10769 Design Ergonomics Evaluation Worksheets plan
人机工程设计评估工作计划ME MD ME SGMW029Technics document  authorized plan 工艺文件的编制计划ME MD CSO 计划/OTS 初
版/S 终版ME 10184Develop Tool and Equipment Design-Press 工装设备的开发进度-冲压ME MD 根据项目要求可四车间合并汇报
ME 10184Develop Tool and Equipment Design-Body 工装设备的开发进度-车身ME MD ME 10184Develop Tool and Equipment Design-Paint 工装设备的开发进度-涂装ME MD ME 10184Develop Tool and Equipment Design-GA
工装设备的开发进度-总装ME MD PUR 10762Complete Supplier Selection Decision for Production Parts.
完成零件供应商定点PUR PE/PC&L PUR SGMW074OTS Parts offer plan and status OTS 零件交样计划进展状态PUR PE VDR PC&L 10643Complete Initial Container Plan.
完成料箱料架计划
PC&L MD MD SGMW025Develop launch Staffing Plan and trainning plan 制定生产启动团队人员及培训计划及生产启动计划.
MD MD QD 10778Conduct Perceptual Quality Assessment - Verified Data Release.感知质量评估-确认数据发布QD    PE QD 10319Program Quality Plan.
项目质量计划
QD    QD  QD
10683Program Quality and Readiness Review Status:Verified Data Release.西安到重庆怎么去方便
PQRR 状态:验证数据发布
QD
PEM/PCE/
QD
2016/2/3
354338501.xls
1 of 1PQE: Yangxl